B.C. funds Fraser River shoreline flood protection in Fraser Valley
A First Nation in British Columbia will receive a boost from the province for shoreline stabilization, with the chief saying it is under consistent threat of flooding. The $5 million aimed at so-called riprap erosion control measures is going to the Sqwa First Nation, Shxwha:y Village and the City of Chilliwack. The announcement comes a week after the province provided $23.4 million in funding to 49 communities to help reduce risks from future disasters related to natural hazards and climate change, including $150,000 for a drainage pump station upgrade design in Chilliwack.
One year after flooding disaster, recovery continues for Fraser Valley farmers
Farmer Richard Bosma points to an armpit-level felt pen mark on the wall of his milking barn to show how high the water rose during the catastrophic flooding on his Fraser Valley dairy farm almost a year ago. "So there were about 54 inches of water here at its peak," he said. In another barn, Bosma introduces assembled media and politicians to Miracle, a black-and-white, hay-munching calf that earned its name by arriving in the world immediately after its mother was rescued from the rising water.